Metro Transit selects HDR for engineering, construction administration services for METRO H Line
When complete, the BRT line will run from downtown Minneapolis to Sun Ray Transit Center on the east side of St. Paul. Metro Transit in Minneapolis has selected HDR for engineering and construction administration services for the METRO H Line, a new bus rapid transit (BRT) line that will run from downtown Minneapolis to Sun Ray Transit Center in St. Paul. The H Line will be the eighth arterial BRT line in Metro Transit's network and aims to deliver faster, more reliable service. The line's recommended corridor plan identifies 46 stations over a 17-mile corridor, with public feedback on station locations underway before detailed engineering begins. HDR has previously led work for Metro Transit on the METERO C, D and E Lines and is a partner on the MetRO Bronze Line. The project will provide project management, engineering services, station design, civil design, transit systems and technology, electrical and traffic engineering, public engagement, risk management and construction administrative.
Được phát hành : 3 giờ trước qua Brandon Lewis trong Business
Metro Transit in Minneapolis has selected HDR to provide engineering and construction administration services for the METRO H Line, a new bus rapid transit (BRT) line that will run from downtown Minne... [2125 symbols]